3-7 July 2017
Africa/Johannesburg timezone

RFQ accelerator beam optimization at Necsa

4 Jul 2017, 17:10
1h 50m
3rd and 4th floor passages (Engineering Building 51)

3rd and 4th floor passages

Engineering Building 51

Board: 48
Poster Presentation Track F - Applied Physics Poster Session 1

Speaker

Mr Tshepo Mahafa (Necsa)

Description

A process of beam optimization was carried out at Necsa following changes made to the HEBT system of the accelerator. This was done to establish the most optimal beam conditions that ensures adequate beam transport is achieved and maintained during acceleration. The optimization method and work will be presented which will detail the 3 step process followed that involved TRACE 3D simulation, quadrant analysis for beam positioning, and a beam to target run for identifying beam position and determining beam size.

Level for award<br>&nbsp;(Hons, MSc, <br> &nbsp; PhD, N/A)?

No

Apply to be<br> considered for a student <br> &nbsp; award (Yes / No)?

No

Would you like to <br> submit a short paper <br> for the Conference <br> Proceedings (Yes / No)?

No

Primary author

Mr Tshepo Mahafa (Necsa)

Co-author

Mr Graham Daniels (Necsa)

Presentation Materials

There are no materials yet.