7-11 July 2014
Africa/Johannesburg timezone
<a href="http://events.saip.org.za/internalPage.py?pageId=16&confId=34"><font color=#0000ff>SAIP2014 Proceedings published on 17 April 2015</font></a>

The iThemba LABS Radioactive Beam Project

10 Jul 2014, 15:20
20m
D Les 101

D Les 101

Oral Presentation Track B - Nuclear, Particle and Radiation Physics NPRP

Speaker

Dr Robert Bark (iThemba LABS)

Level for award<br>&nbsp;(Hons, MSc, <br> &nbsp; PhD)?

PhD

Apply to be<br> considered for a student <br> &nbsp; award (Yes / No)?

No

Would you like to <br> submit a short paper <br> for the Conference <br> Proceedings (Yes / No)?

No

Abstract content <br> &nbsp; (Max 300 words)<br><a href="http://events.saip.org.za/getFile.py/access?resId=0&materialId=0&confId=34" target="_blank">Formatting &<br>Special chars</a>

iThemba LABS proposes to acquire a new cyclotron for production of radioactive beams using the ISOL method. In 2013, the NRF awarded a Strategic Research Infrastructure Grant to iThemba LABS to build a radioactive beams test facility for the production of low-energy (50 keV) beams and to conduct a technical design study for a larger facility. A status report on the project will be given.

Primary author

Dr Robert Bark (iThemba LABS)

Presentation Materials

There are no materials yet.