12-15 July 2011
Saint George Hotel
Africa/Johannesburg timezone

The IThemba LABS Radioactive Beam Project

14 Jul 2011, 13:45
30m
Acro8

Acro8

Oral Presentation Track B - Nuclear, Particle and Radiation Physics NPRP

Speaker

Dr Robert Bark (iThemba LABS)

Description

A feasibility to develop a radioactive beam facility at iThemba LABS has commenced. The proposal envisages the addition of a new cyclotron, a k70 negative-ion accelerator. Such an accelerator can supply two beams simultaneously, one to be used for isotope production and neutron therapy, the other to create radioactive ions. These can be post accelerated by the existing SSC accelerator to energies of 5~7 MeV/A. It is envisaged that the beamtime available for nuclear physics, presently restricted to weekends only, will more than double. The feasibility study aims to minimize costs and maximize performance. However, many technical challenges remain in producing radioactive beams so the study also aims at minimizing risks.

Level (Hons, MSc, <br> &nbsp; PhD, other)? other
Consider for a student <br> &nbsp; award (Yes / No)? no
Would you like to <br> submit a short paper <br> for the Conference <br> Proceedings (Yes / No)? no

Primary author

Dr Robert Bark (iThemba LABS)

Presentation Materials

There are no materials yet.