7-11 July 2014
Africa/Johannesburg timezone
Home > Timetable > Session details > Contribution details
PDF | XML | iCal

The iThemba LABS Radioactive Beam Project

Presented by Dr. Robert BARK on 10 Jul 2014 from 15:20 to 15:40
Type: Oral Presentation
Session: NPRP
Track: Track B - Nuclear, Particle and Radiation Physics

Abstract

iThemba LABS proposes to acquire a new cyclotron for production of radioactive beams using the ISOL method. In 2013, the NRF awarded a Strategic Research Infrastructure Grant to iThemba LABS to build a radioactive beams test facility for the production of low-energy (50 keV) beams and to conduct a technical design study for a larger facility. A status report on the project will be given.

Award

No

Level

PhD

Paper

No

Place

Room: D Les 101


Primary authors

More